When you need us

Hoists on the move.

New premises

Workshop moves

Moving every hoist from your old site to the new one, scheduled so you're not off the tools longer than you need to be.

Same site

Bay changes

Moving hoists to new bays when you change the workshop layout or add equipment.

Second-hand

Used hoists

Bought a used hoist? We'll de-install it at the seller's site and install it at yours.

Leaving a lease

Removals

Taking hoists out cleanly when you vacate a site, so the landlord gets the floor back.

How a relocation runs

Moved properly, certified again.

  1. 01

    Inspect & plan

    We inspect the hoists and check the slab, ceiling height and power at the new location, then plan the move around your workshop.

  2. 02

    De-install

    Hoists are safely lowered, depressurised, disconnected and dismantled, with every component kept together and labelled.

  3. 03

    Re-install

    Positioned, re-anchored, levelled and aligned to the manufacturer's spec at the new location.

  4. 04

    Test & certify

    Re-commissioned and load-tested, with a compliance certificate and digital report for the new site.

Good time to refresh

Worth doing while it's apart.

A hoist is never easier to work on than during a move. We'll tell you if cables, seals, pads or other wear parts are worth replacing before it goes back up, and set it up on a Hoist Care subscription at the new site.

4-post hoist re-installed with drive-on ramps
FAQ

Relocation questions

Can any hoist be relocated?
Most 2-post, 4-post and scissor hoists can be moved. We inspect them before the move. If a hoist is worn, damaged or close to its 10-year major inspection, we'll tell you whether it's worth moving or replacing.
Does a relocated hoist need to be re-certified?
Yes. A hoist must be re-installed to the manufacturer's spec and load-tested at the new location before it's used. We re-commission it and issue a compliance certificate for the new site.
Will my new floor take the hoist?
We check the slab at the new site before the move: thickness, condition and levels, plus ceiling height and power. That way there are no surprises on the day.
How do you keep downtime down when a whole workshop moves?
We plan the move with you, often moving hoists in stages or over a weekend, so you can keep working at one site until the other is ready.
Can you move a hoist within the same workshop?
Yes. Moving hoists to new bays when you reconfigure a workshop is a common job for us.
Get in touch

Get a free quote

Tell us how many hoists, the make and model if you know it, and where they're moving from and to.

Request a quote

We reply within one business day. Prefer to talk? Call 0405 475 078.

Call Free Quote